
|
Client |
ZSL |
|
Architect |
Kozdon Wharmby |
|
Design |
Dusty Gedge and Dr Stephan Brenneisen on behalf of Livingroofs.org |
|
Main Contractor |
ITC Concepts Ltd. |
|
Roofing Contractor |
Miller Roofing Ltd. |
|
Type of Development |
Accommodation for the first pair of Komodo Dragons ever to be housed at London Zoo. |
|
Reason for Green Roof |
Planning requirement as the development is overlooked by Regents Park, and as part of the Zoo’s Sustainability policy. |
|
Type of Roof |
SarnaVert Extensive Biodiverse Green Roof System |
|
Size of Green Roof |
300m2 |
|
Build up of Roof |
18mm plywood deck. |
|
Comments |
The design is based on design principals developed in Switzerland for biodiversity and adapted to the London situation by Livingroofs.org and is a study roof in Green roofs and biodiversity research project - see phd research. A short article concerning the Dragon House project was published in Building Magazine and is available to download in .pdf format here [400KB]. |
|
Completion Date |
August 2004 |





