Client |
Capernwray Diving & Leisure Ltd |
|
Architect |
Design and Build |
|
Design |
Peter Clark (Clark Design & Construction) |
|
Main Contractor |
Genesis Construction |
|
Roofing Contractor |
Genesis Construction |
|
Type of Development |
Sustainable timber framed, stone clad, private lodges. |
|
Reason for Green Roof |
Planning requirement for properties to blend into surrounding countryside. |
|
Type of Roof |
Hertalan EPDM extensive Wildflower Meadow System |
|
Size of Green Roof |
1400m2 |
|
Build up of Roof |
18mm plywood deck, 1.5mm hertalan EPDM, FLL approved, prefabricated one piece membrane fully adhered to all perimeter edges and upstands, 300grm per m2 geotextile protective moisture fleece, hertalan polyethylene moisture retaining drainage board 2m x 1m x 25mm, seperating layer, 75mm hertalan extensive soil substrate mixture of recycled brickwork and compost, Lindum wildflower meadow turf with mixture of local plant species. |
|
Comments |
The properties were designed to have minimum visual impact on the surrounding countryside and encourage biodivesity. |
|
Completion Date |