
|
Client |
Cambridge University Estate Management and Building Service |
|
Architect |
Edward Cullinan Architects |
|
Main Contractor |
John Laing Construction |
|
Alumasc Approved Specialist Sub-Contractor |
Briggs Roofing & Cladding |
|
Type of Development |
University Building / Maths Facility |
|
Reason for Green Roof |
|
|
Type of Roof |
Intensive Green Roof |
|
Size of Green Roof |
a total 1200m2 |
|
Build up of Roof |
The roof comprises a Hydrotech waterproofing system with root barrier, Top-foam extruded polystyrene insulation systems and a Floradrain FS100 drainage layer specially designed for use on pitched green roofs. Alumasc also supplied the 200mm-deep layer of intensive soil and turf. |
|
Comments |
The building will eventually comprise seven satellite ‘pavilions’ linked to central building via pathway bridges. |
|
Completion Date |
July 2000 |





